EN  PT  FR  ES

BasisSchool de Driehoek

Sur le Projet

Public building divided in two volumes that will result in Driehoek’s new primary school.

The OJP has established foundations with technical pits, properly isolated; reinforced concrete superstructure made in situ and with prefabricated elements; solid slabs, ramp slabs and prefabricated lightened slabs; stairway laying.

The OJP was also responsible for all interior and exterior masonry work.

Client:

Scholen van Morgen

Durée du Projet:

12 mois

Localisation:

Bocholt, Belgique