Construction of 3 hydro-electric power stations, supply canals and dissipation ramp. There are 3 Projects to be built in parallel with 3 existing locks.
OJP made the structure of the water conducting canals and of the technical building in reinforced concrete; operation with high tonnage mobile cranes.