EN  PT  FR  ES

AZ Sint-Jan – Pediatrie

About the Project

Expansion of the Bruges hospital by the construction of a new paediatric wing adjacent to the existing building, with a total area of approximately 9,000 m2 constituted by a basement and 4 storeys above ground.

OJP constructed practically all the building, with the exception of the pre- fabricated staircases, in reinforced concrete made in situ; included in this ambit was also the structural junction of the new building to the existing one.

Client:

AZ Sint-Jan Brugge Oostende A.V.

Duration of the Project:

8 months

Location:

Brugges, Belgium