Public building divided in two volumes that will result in Driehoek’s new primary school.
The OJP has established foundations with technical pits, properly isolated; reinforced concrete superstructure made in situ and with prefabricated elements; solid slabs, ramp slabs and prefabricated lightened slabs; stairway laying. The OJP was also responsible for all interior and exterior masonry work.