2 5-storey buildings above a 3-storey underground car park for residential and commercial use. Set in green areas, the building overlooks a central public footpath.
OJP executed the footings of the foundations, with slab foundations and retaining walls; superstructure in reinforced concrete made in situ and pre-fabricated elements (pillars, beams and walls); floor slabs, ramp slabs and pre-fabricated lightweight floor slabs; insertion of pre- fabricated stairways; structural brickwork with silico-calcareous blocks; masonry of exposed concrete blocks and concrete blocks to be overlaid; solid ceramic brickwork on the facades.