About the Project

Willemen Group has granted the construction of a new container terminal for APM Terminals Tangier MedPort to OJP. The terminal was built in a 60 hectares area and has a length of 1,200 meters. It is the first automated container terminal in Africa.

Our contract consisted in two ‘packages’.
The Package A consisted in all road works and sewage, in the construction of utility pipes and the paving and sealing works.
Package B included the construction of the 1,200 meter long crane support beam into which the lifting means will be placed.

Client:

Willemen Group

Duration of the Project:

18 months

Location:

Tanger, Morroco