EN  PT  FR  ES

Lake Front, Knokke – 2 Phases

HomeRESIDENTIAL AND NON-RESIDENTIAL BUILDINGSLake Front, Knokke – 2 Phases

About the Project

Construction of luxury apartments in an excellent hotel region on the Belgian coast, whose investor is the biggest real estate developer in the country. It is a residential complex composed of 4 buildings, each with 4 storeys and a 1 storey underground car park.

OJP made the structure from reinforced concrete made in situ and laid the pre-fabricated lightweight floor slabs; structural masonry in Silico- Calcareous blocks; masonry with visible concrete blocks and others to be overlaid; masonry in solid ceramic bricks on the facades and small surrounding garden walls.

Client:

Immobel N.V.

Duration of the Project:

15 months

Location:

Knokke, Belgium