1 underground storey and 4 floors above ground with a total area of 10,400m2 with pharmaceutical laboratories for 250 scientists.
OJP made the foundations with solid concrete heading posts and retaining walls around the perimeter of the basement; all the structure is in reinforced concrete made in situ; floor slabs and pre-fabricated floor slabs. Special Conditions: project constructed within an investigation campus with extremely high demands for security and hygiene. All our workforce have VCA certification.