EN  PT  FR  ES

Temse Station

HomeINFRASTRUCTURESTemse Station

About the Project

3 pedestrian accesses to the station platform, adaptation of the existing tunnel, construction of a ramp from scratch and stairwells.

OJP constructed the foundations, retaining walls, ramp and stairwells; structure of the retaining walls underpinned with reinforced concrete beams; all the visible concrete elements are architectural; concreting of the ramp slabs with specific finishing; insertion of pre-fabricated reinforced concrete staircases.

Client:

Infrabel

Duration of the Project:

3 months

Location:

Temse, Belgium