VUB Project XY

About the Project

Construction of 4 buildings (X1, X2, Y and I) of 5 and 6 storeys and underground parking for student residences, theatre, rooms for student organizations and for the administration of the VUB.

OJP made the superstructure in reinforced concrete in situ with pre- fabricated elements; pre-fabricated floor slabs and lightweight floor slabs; insertion of pre-fabricated staircases. Special Projects: concrete staircases made in situ in the atrium; visible non-structural concrete block masonry.

Client:

THV Denys - Louis de Waele

Duration of the Project:

15 months

Location:

Ixelles - Brussels, Belgium